35. the design for the new electric car has been approved by the board and production is underway, but the vp of manufacturing is nervous about the rate of defective parts from suppliers. see original list screenshot below. he has decided to use the subtotal feature to generate a report that shows subtotals of defects by subassembly name, with a grand total at the end, such as the desired report below. his report, however, looks like the report generated, below. which description would create this?