milo is going over the procedures that her manufacturing plant has for disposing of its wastewater. the plant has two point sources: one discharges into a self-contained large lake and the other is piped into a river near the state border at a point just before the river flows into a neighboring state. under the clean water act (cwa), milo must obtain a permit for: