The following data represent the time (in hours) between defects recoded after the production of a critical to quality characteristic: (A) Does it appear that the recorded times follow the normal distribution? Apply an appropriate transformation if needed. (B) Establish a control chart to monitor future production. Assume assignable causes can be eliminated and revise the limits.