The settlement analysis for a proposed structure indicated that 2 cm of settlement will occur in 1 year, and that the ultimate settlement will be about 12 cm. The structure was redesigned, with a net decrease in building load of 25%. The ultimate settlement of the redesigned structure was calculated to be about 9 cm. What is the settlement (cm) that will occur in 1 year for the redesigned structure? 0.5 0.8 1.5 2 What is the time (months) for 2 cm of settlement for the redesigned structure? 9 12 21 32