A job cost sheet of Sandoval Company is given below.
Job Cost Sheet
JOB NO. 469 Quantity 2,500
ITEM White Lion Cages Date Requested 7/2
FOR Todd Company Date Completed 7/31
Date Direct Materials Direct Labor Manufacturing Overhead
7/10 700 12 900 15 440 550
22 380 475
24 1,600 27 1,500 31 540 675
Answer the following questions. (1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job?
(2) What is the predetermined manufacturing overhead rate? (Round answer to 0 decimal places e.g 135.) Predetermined manufacturing overhead rate%
(3) What are the total cost and the unit cost of the completed job? (Round unit cost to 2 decimal places, e.g. 1.25.)
(4) Prepare the entry to record the completion of the job.