cenario Suppose that an aircraft manufacturer desires to make a prenanary etate of the s $100 million 20 years ago when the approximate cost dex was 400 a d that coll der Solution: We can see from the scenario that we are asked to estimate the cost of a start with either one of them. If we choose to c the indexing method fint plack of differees sing and fed the con and to coll sep For the 200MW power plant built 20 years ago, the cost index, The cost of the new power plant (200MM C mil Next, as we already know the cost to build a 200MW power plant toder CC we can ose the Power MW, and the size of the 600MW plant Mw they power plant C₂-S nga Mt bro The Le porte de materija the plans säng mema INA Scenario: Suppose that an aircraft manufacturer desires to make a preliminary estimate of the cost o building a 600 MW fost fuel plant for the ently of its new lng $100 million 20 years ago when the approximate cost index was 400, and that cost indes is now 1.200. The cost capacity f ditance archit power of the dreng method and then the Solution. We can see from the scenario that we are asked to estimate the cost of a new power plant of different se start with either one of them. If we choose to do the indexing method first, we are trying to find the cost of the s For the 200MW power plant built 20 years ago, the cost indes and its The cost of the new power plant (200MW C million Next, as we already know the cost to build a 200MW power plant today ing. Gl MW, and the size of the 600MW plant Power ng method to figure out the cost of a 600MW power plant. The size of the 200 MW. As the cost capacity far power plant C-S million we are going to buda new power plant of the same the we can the poengeted to the of the w