Using the same scenario from the previous unit on scheduling, create a time-phased budget for the following project. Prepare a figure like Exhibit 10.9, CPT 4e, that illustrates the daily and cumulative costs for the resource-leveled project.
Assume the following hourly rates:
Alcides $45 / hr.
Joan $50 / hr.