A part manufactured at a factory is known to be 12.05 cm long on average, with a standard deviation of 0.275. One day you suspect that that the part is coming out a little longer than usual, but with the same deviation. You sample 15 at random and find an average length of 12.27. What is the z- score which would be used to test the hypothesis that the part is coming out longer than usual?