In a project it is intended to transport 280 Lt/sec of oil whose SG=0.87 and viscosity is 0.16 poise. For this, it is planned to install cast iron pipes of 60 cm in diameter. If it starts in a pump house, the outlet pressure is 3.5 Kg/cm2. How far away should the next pumping station be located?