bunnycx8982 bunnycx8982 25-01-2024 Engineering contestada If the NPV of drilling a well is $10MM. The dry hole cost is $3MM, and the chance of success is 75%. what is the EMV?A) $7.5MMB) $10MMC) $12.5MMD) $15MM