Suppose that a metal rod is supposed to be cut 51.8 mm. in length. The upper spec limit is set at 52.9 mm., and the lower spec limit set at 50.7 mm. A metal rod that is out of spec must be scrapped at a cost of $32.00. The company uses the Taguchi Quality Loss Function to estimate quality costs. Suppose that a sample of three units was taken, and the rod measurements were: 51.5, 52.8, and 53.7 mm., respectively. What is the total Taguchi Quality Cost of that sample of three units?
a) The Taguchi parameter T is
enter your response here$/mmsquared (round your response to two decimal places).
b) The Taguchi Quality Cost of the first metal rod is $
enter your response here (round your response to two decimal places).
c) The Taguchi Quality Cost of the second metal rod is $
enter your response here (round your response to two decimal places).
d) The Taguchi Quality Cost of the third metal rod is $
enter your response here (round your response to two decimal places).
e) What is the total Taguchi Quality Cost of that sample of three units? $
enter your response here (round your response to two decimal places)