Suppose that a metal rod is supposed to be cut 51.8 mm. in length. The upper spec limit is set at 52.9 ​mm., and the lower spec limit set at 50.7 mm. A metal rod that is out of spec must be scrapped at a cost of ​$32.00. The company uses the Taguchi Quality Loss Function to estimate quality costs. Suppose that a sample of three units was​ taken, and the rod measurements​ were: 51.5​, 52.8​, and 53.7 mm.​, respectively. What is the total Taguchi Quality Cost of that sample of three​ units?
​a) The Taguchi parameter T is

enter your response here​$/mmsquared ​(round your response to two decimal ​places).
​b) The Taguchi Quality Cost of the first metal rod is ​$

enter your response here ​(round your response to two decimal ​places).
​c) The Taguchi Quality Cost of the second metal rod is ​$

enter your response here ​(round your response to two decimal ​places).
​d) The Taguchi Quality Cost of the third metal rod is ​$

enter your response here ​(round your response to two decimal ​places).
​e) What is the total Taguchi Quality Cost of that sample of three​ units? ​$

enter your response here ​(round your response to two decimal ​places)