Respuesta :
[tex]\sf Hello![/tex]
• [tex]\sf Length \:of\: road \:built\: each\: day = 3.5 \:km[/tex]
• [tex]\sf Total\: number \:of\: days\: the\: crew\: worked = 14.4 \:Days[/tex]
[tex]\sf Then,[/tex]
[tex]\sf Total\: length \:of \:road \:bulit[/tex] :
= [tex]\sf No. \:of \:days \:crew \:worked × Length \:of \:road\: built \:each\: day[/tex]
= [tex]\sf 14.4 × 3.5 \:kilometers[/tex]
= [tex]\sf 50.4 \:kilometers [/tex]
~ [tex]\sf iCarl[/tex]
• [tex]\sf Length \:of\: road \:built\: each\: day = 3.5 \:km[/tex]
• [tex]\sf Total\: number \:of\: days\: the\: crew\: worked = 14.4 \:Days[/tex]
[tex]\sf Then,[/tex]
[tex]\sf Total\: length \:of \:road \:bulit[/tex] :
= [tex]\sf No. \:of \:days \:crew \:worked × Length \:of \:road\: built \:each\: day[/tex]
= [tex]\sf 14.4 × 3.5 \:kilometers[/tex]
= [tex]\sf 50.4 \:kilometers [/tex]
~ [tex]\sf iCarl[/tex]
Answer:
50.4 kilometer
Step-by-step explanation:
Given: A construction crew has just finished building a road. The crew worked for 14.4 days. If they built 3.5 kilometers of road each day.
To Find: the total length of road they built.
Solution:
The number of days construction crew worked [tex]=14.4[/tex] [tex]\text{days}[/tex]
kilometers of road built by construction everyday [tex]=3.5[/tex] [tex]\text{kilometer}[/tex]
Now,
Total length of road built by construction road by crew
[tex](\text{number of days construction crew worked})\times(\text{kilometer of road built everyday})[/tex]
On putting values,
[tex]14.4\times3.5[/tex]
[tex]50.4[/tex] [tex]\text{kilometer}[/tex]
Therefore, Total length of road built by construction crew in [tex]14.4[/tex] [tex]\text{days}[/tex] is [tex]50.4[/tex] [tex]\text{kilometer}[/tex]