The ____ documents a system at the end of the design phase, identifies any changes since the beginning of the project, and includes testing and verification of all system requirements and features. functional baseline operational baseline allocated baseline product baseline

Respuesta :

Answer:

allocated baseline

Explanation:

The allocated baseline documents a system at the end of the design phase, identifies any changes since the beginning of the project, and includes testing and verification of all system requirements and features.

Hope this helps!

Answer:

allocated baseline

Explanation:

Th allocated baseline documents a system at the end of the design phase, identifies any changes since the beginning of the project, and includes testing and verification of all system requirements and features. functional baseline operational baseline allocated baseline product baseline

In at software development, baselines are created at various planned points in the software development process. The baseline is also very useful when you need to create a “branch” to provide an emergency fix based off of some baseline of code that was delivered to a customer.