Match each of the definitions that follow with the term it defines.
Engineering change order Total cost concept
Variable cost concept Normal selling price
Setup A document that initiates a product or process change
Includes manufacturing costs plus selling and administrative expenses Changing tooling when preparing for a new product
Target selling price to be achieved in the long term Variable manufacturing costs plus variable selling and administrative costs are included in cost per unit