Several factors have been considered before the construction was started. This includes the wildlife in the area and certain precautions have been made for their benefit and protection. This part of the Mojave Desert was chosen because it has the best potential in absorbing the sun’s energy rays at anytime of the year thus giving the assurance that the solar power supply will be enough all year round.