Answer:
Estimated manufacturing overhead rate= $29.84 per machine hour.
Explanation:
Giving the following information:
Hibshman Corporation bases its predetermined overhead rate on the estimated machine-hours. The Corporation estimated the machine-hours for the upcoming year at 10,000 machine-hours. The estimated variable manufacturing overhead was $6.82 per machine-hour and the estimated total fixed manufacturing overhead was $230, 200.
Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= (230200/10000)+6.82= $29.84 per machine hour.