Answer:
14.89% or 0.1489
Step-by-step explanation:
First, find the z-score for both 70 and 80 minutes and their corresponding percentile.
[tex]z= \frac{X - \mu }{SD} \\SD=\sqrt{V} =\sqrt{12}\\\mu =75\\z= \frac{X - 75}{\sqrt{12}}\\\\[/tex]
For X = 70 minutes:
[tex]z= \frac{70 - 75}{\sqrt{12}}\\z=-1.4434[/tex]
This z-score is equivalent to the 7.445 th percentile, so the probability of a student finishing this exam in less than 70 minutes is 7.445%
or X = 80 minutes:
[tex]z= \frac{80 - 75}{\sqrt{12}}\\z=1.4434[/tex]
This z-score is equivalent to the 92.555 th percentile, so the probability of a student finishing this exam in more than 80 minutes is 100- 92.555 = 7.445%
Therefore, the probability (P) of a student finishing this exam in less than 70 minutes or more than 80 minutes is:
P = 7.445% + 7.445% = 14.89%