Answer:
Force constant will be 1195.85 N/m
Work done will be 1.6859 J
Explanation:
We have given the force, F = 63.5 N
Spring is stretched by 5.31 cm
So x = 0.0531 m
Force is given , F = 63.5 N
We know that force is given by [tex]F=kx[/tex]
So [tex]63.5=k\times 0.0531[/tex]
k = 1195.85 N/m
Now we have to find the work done
We know that work done is given by
[tex]W=\frac{1}{2}kx^2=\frac{1}{2}\times 1195.85\times 0.0531^2=1.6859J[/tex]