a. How much work is done when a 185g tomato is lifted 15.0m? b. The tomato is dropped. What is the velocity, v, of the tomato when it hits the ground? Assume 82.1 % of the work done in Part A is transferred to kinetic energy, E, by the time the tomato hits the ground.