Answer:
Job cost sheet
Beginning /Materials / Labor / *overhead / Total
>J/58 0 9200 14400 3840 27440
>J/59 0 8900 10800 2880 22580
>J/60 0 6400 7200 1920 15520
24500 32400 8640 65540
Journal entries:
raw materials 29670
accounts payable 29670
WIP 24500
raw materials 24500
WIP 32400
wages payables 32400
factory overhead 17880
accounts payable 17880
WIP 8640
factory overhead 8640
Finished Goods 50,020**
WIP inventory 50,020
***COGS 53,040
Finished Goods 53,040
Accounts receivables 74256
*4 Sales revenue 74256
Explanation:
* the overhead is calcualte as the direct labor per job (800 ; 600; 400 respectively) times the overhead rate of 4.80
** the finished goods are Job 58 for a cost of 27,440 and 59 which cost is 22,580 we add the mand get 50,020 for the amount transferred int ofinished goods
***the cost of good sold will be J/57 of 25,600 plus J/58
*4 the sales revenue will be COGS times 1.4 as is the manufacturing cost plus a 405 markup.