According to the instructions shown, what is a condition for the project to be successfully delivered to the customer?

A) All pipe must be sorted by length and diameter.
B) The customer does not want pipe that is damaged.
C) Six meter long pipe must be stacked on pallet 2.
D) Ten meter long and up pipe must be put in outside storage.