Tile & Grout (T&G) contracts to resurface the insides of the pools at Water World Park. T&G knows that without the resurfacing, Water World will have to delay its seasonal opening. T&G does not perform as promised. As consequential damages, Water World can recoverâ___________.A) âthe cost of new pools.B) âthe difference between T&G's price and the eventual cost of resurfacing.C) âthe loss of profit from the delayed opening.D) ânothing.