Respuesta :
Answer:
Step-by-step explanation:
Given that, the length of the chain is
L= 19m
And the mass of the chain is
M= 84kg
Work to raise the chains to a height of
H = 7m
Acceleration due to gravity
g = 9.8m/s²
Since the chain is 19m long and it has a mass of 84kg
Then, it mass/ length is 84/19
M/L = 4.42kg/m
So, it weight / length is mass / length × gravity
W/L = M/L × g
W/L = 4.42 × 9.8
W/L = 43.33 N/m
So, workdone can be calculated using
Work = ∫F∆x
Work = ∫(W/L)•xdx.
Work = ∫43.33x dx. From x = 0 to 7
Work = 43.33 ∫x dx.
Work = 43.33 x²/2. From x = 0 to 7
Work = 21.66 [x²] from x = 0 to 7
Work = 21.66 ( 7²-0²)
Work = 21.66 × 49
Work = 1061.5 Joule
The workdone to lift the chain to 7m is 1061.5 J
"When work is done to lift the chain to 7m is 1061.5 J. To understand the calculations, check below".
Calculation of Acceleration due to Gravity
Given that, the length of the chain as per the question is:
L= 19m
And also the mass of the chain is
Then M= 84kg
Now Work to raise the chains to a height of
After that H = 7m
Acceleration due to gravity
Then g = 9.8m/s²
Since When the chain is 19m long and it has a mass of 84kg
Then, it mass/ length is 84/19
M/L = [tex]4.42kg/m[/tex]
After that, it weight / length is mass / length × gravity
W/L = M/L × g
W/L = 4.42 × 9.8
W/L = 43.33 N/m
Then, work done can be calculated using
Work is = ∫F∆x
Work is = ∫(W/L)•xdx.
Then Work = ∫43.33x dx. From x = 0 to 7
After that Work = 43.33 ∫x dx.
Now Work = 43.33 x²/2. From x = 0 to 7
Work is = 21.66 [x²] from x = 0 to 7
Work is = 21.66 ( 7²-0²)
Then Work = 21.66 × 49
Hence Work = 1061.5 Joule
Therefore, The work done to lift the chain to 7m is 1061.5 J
Find  more information about Acceleration due to Gravity here:
https://brainly.com/question/88039