Select the correct text in the passage.
A construction company is building a new shopping mall. Following is an excerpt from their letter to the mayor about the new project. Identify
the sentence that represents a preventive action to limit mass movement on the construction site.
The site of the mall is within the city limits, near the base of a mountain. It is 1.75 miles from a fracking site. An Interstate highway will be carved
out of the mountain and will pass over a pond. The excavation will place parts of the mall's foundation approximately 2 inches below the water
table line. A construction company has been called in to divert all excess water flowing into the pond to an unused natural reserve 800 feet
away. The construction company is using the most technologically advanced methods.

Respuesta :

Answer:

A construction company has been called in to divert all excess water flowing into the pond to an unused natural reserve 800 feet

away.

Explanation:

Everything else is smoke and mirrors or just irrelevant

According to the question, A construction company has been called in to divert all excess water flowing into the pond to an unused natural reserve 800 feet away.

What is the work of construction?

It starts with planning, financing, and design, and continues until the asset is built and ready for use, construction also covers repairs and maintenance work, any works to expand, extend and improve the asset, and its eventual demolition, dismantling.

Thus, option "C" is correct.