Respuesta :
The plantwide predetermined overhead rate is $345,000 and the total manufacturing cost of Job 550 is $472.
Plantwide predetermined overhead rate
1.
a. The estimated total overhead cost:
Estimated fixed manufacturing overhead $ 225,000
Estimated variable manufacturing overhead 120,000
($1.60per DLH × 75,000 DLH)
Estimated total manufacturing overhead cost $345,000
The predetermined overhead rate:
Estimated total manufacturing overhead (a) $ 345,000
Estimated total direct labor-hours (b) 75,000 DLH
Predetermined overhead rate (a) ÷ (b) $4.60 per DLH
b. Total manufacturing cost assigned to Job 550:
Direct materials $ 178
Direct labor $225
Manufacturing overhead applied $69
($4.60 per DLH × 15DLA)
Total manufacturing cost of Job 550 $472
c. The selling price for Job 550:
Job 550
Total manufacturing cost $472
Markup (200%) $944
Selling price $1,416
2.
a. The estimated total overhead cost
Estimated fixed manufacturing overhead $ 225,000
Estimated variable manufacturing overhead $120,000
($3.20 per MH × 37,500 MHs)
Estimated total manufacturing overhead cost $345,000
Predetermined overhead rate:
Estimated total manufacturing overhead (a) $345,000
Estimated total machine-hours (b) 37,500 MHs
Predetermined overhead rate (a) ÷ (b) $9.20 per MH
b. Total manufacturing cost assigned to Job 550:
Direct materials $ 178
Direct labor 225
Manufacturing overhead applied $46
($9.20per MH × 5 MH)
Total manufacturing cost of Job 550 $449
2.
c. The selling price for Job 550:
Job 550
Total manufacturing cost $ 449
Markup (200%) $898
Selling price $1,347
Therefore the plantwide predetermined overhead rate is $345,000 and the total manufacturing cost of Job 550 is $472.
Learn more about Plantwide predetermined overhead rate here:https://brainly.com/question/26299455
#SPJ9