Answer: False
Explanation:
For a high volume Process, Process C would be the best option because it has the lowest cost at higher volumes.
Process A would be the best option if the company was looking for a low volume production process because at that point, it has the lowest cost. When it comes to high volume production though, Option A is the worst option as it is the most expensive.