Respuesta :
Answer:
$ 22.97
Explanation:
Calculation for the total manufacturing cost per boat
First step is to Calculate the Activity rates
Activity Cost Pool Activity driver Overhead Cost (A) Expected Activity (B) Activity rate (A/B)
Materials handling Number of Part
$ 3,300Ă· 3000 =$ 1.10 Per Part
Assembling Number of Part
$ 4,800Ă·3000 =$ 1.60 Per Part
Packaging Number of Boat
$ 6,000Ă· 1300 =$ 4.62 Per Boat
Second step is to Calculate the Cost assigned to Boat
Activity name Activity Rates Activity ABC Cost
(A) (B) (A x B)
Materials handling
$ 1.10 Ă— 4.00=$ 4.40
Assembling
$ 1.60 Ă— 4.00 =$ 6.40
Packaging
$ 4.62 Ă— 1.00 = $ 4.62
Total Overheads assigned per boat $ 15.42
($4.40+$6.40+$4.62)
Last step is to Calculate for the total manufacturing cost per boat
Boat
Direct material $ 7.55
Direct labor $0
Overheads $15.42
Total Cost per unit $ 22.97
($7.55+$15.42)
Therefore the total manufacturing cost per boat is $ 22.97