Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours 47,000 Total fixed manufacturing overhead cost $ 202,100 Variable manufacturing overhead per direct labor-hour $ 2.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 50 Total direct labor-hours 100 Direct materials $ 850 Direct labor cost $ 4,700 The total job cost for Job P951 is closest to: (Round your intermediate calculations to 2 decimal places.)

Respuesta :

Answer:

Total cost= $6,180

Explanation:

First, we need to calculate the predetermined overhead rate:

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= (202,100/47,000) + 2

Predetermined manufacturing overhead rate= $6.3 per direct labor hour

Now, we can allocate overhead:

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Allocated MOH= 6.3*100

Allocated MOH= 630

Finally, the total cost:

Total cost= 850 + 4,700 + 630

Total cost= $6,180