Prepare a cost estimate for the construction of a small, high quality, office building that contains 18,525 square feet of floor area. Use the data on the last page to prepare the estimate. Assume the cost of design for the project is 7% of construction, and a site-work cost of $180,000. What range or percentage of this cost would you recommend to define the level of accuracy