Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production 200,000 Fixed manufacturing overhead cost $ 2,800,000 Variable manufacturing overhead cost per machine-hour $ 2.00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job P90 was started, completed, and sold to the customer for $3,200. The following information was available with respect to this job: Direct materials $ 1,472 Direct labor cost $ 1,056 Machine-hours used 79 Compute the total manufacturing cost assigned to Job P90.

Respuesta :

Answer:

the  total manufacturing cost assigned to Job P90 is $3,792

Explanation:

The computation of the  total manufacturing cost assigned to Job P90 is given below:

But before that the predetermined overhead rate should be calculated

So,

= ($2,800,000 ÷ 200,000) + $2

= $16

Now the total manufacturing cost is

= $1,472 + $1,056 + 79 × $16

= $3,792

hence, the  total manufacturing cost assigned to Job P90 is $3,792