The time required to change a machine from making one product or service to the next is called A) setup time.
Setup time is the c programming language needed to adjust the settings on a machine, in order that it is prepared to manner a task. Shortening the amount of setup time is critical for conducting short production runs, in order that an enterprise can greater without difficulty engage in only-in-time manufacturing.
Setup Time is the time the enter facts signals are stable (either high or low) earlier than the lively clock facet occurs. Maintain Time is the time the input records signals are stable (both high or low) after the lively clock part occurs.
Setup time is defined as the minimal amount of time before the clock's lively edge through which the statistics ought to be stable for it to be latched efficiently. Any violation in this required time causes wrong statistics to be captured and is called a setup violation.
Learn more about setup time here: https://brainly.com/question/20217958
#SPJ4