A cost-benefit analysis CBA, which is normally performed during the seceded study phase, must be evaluated and confirmed prior to the construction of the project design. Thus, the correct option is (D).
A project plan establishes project goals and objectives, describes activities and how goals will be met, and determines what resources will be required, as well as corresponding budgets and completion timeframes.
A benefit-cost analysis CBA, which is often completed during the seismic research stage, must be verified and confirmed prior to project design construction.
Therefore, it can be concluded that the correct option is (D).
Learn more about cost-benefit analysis here:
https://brainly.com/question/15411875
#SPJ4
Your question is incomplete, but most probably the full question was….
List of options:-
A) RFP
B) WBS
C) SDLC
D) CBA