Suppose the cost per ton f(x) to build an oil platform of x thousand tons is approximated byf(x)= 62,500 ______ x+125What is the cost per ton for x=30?

Given that
The cost per ton f(x) to build an oil platform of x thousand tons is approximated by
[tex]f(x)=\frac{62500}{x+125}[/tex]The cost per ton for x = 30, i.e f(30) will be
[tex]\begin{gathered} f(x)=\frac{62500}{x+125} \\ f(30)=\frac{62500}{x+125}=\frac{62500}{30+125}=\frac{62500}{155} \\ f(30)=\frac{62500}{155}=403.226\text{ (3 d.p)} \\ f(30)=403.226\text{ (3 d.p)} \end{gathered}[/tex]Hence, the answer is 403.226 (3 d.p)