INFORMATION:
We know that:
- 1.9 cu yd of sand are needed for every 100 sq yd of surface
And we must find how much sand will be needed for 290 sq yd of surface
STEP BY STEP EXPLANATION:
To find it, we can write that 1.9 cu yd of sand are needed for every 100 sq yd of surface in the form of a fraction
[tex]\frac{1.9yd^3}{100yd^2}[/tex]Then, to find how much sand will be needed for 290 sq yd of surface, we must multiply it by the fraction
[tex]290yd^2\times\frac{1.9yd^3}{100yd^2}[/tex]Finally, simplifying
[tex]5.51yd^3[/tex]So, 5.51 cu yd of sand will be needed for 290 sq yd of surface.
ANSWER:
5.51 cu yd of sand will be needed for 290 sq yd of surface.