00 20 120 19 239 18 357 15 472 12 584 on the following graph, use the blue points (circle symbol) to plot the firm's labor demand curve. then, use the orange line (square symbols) to show the wage rate. (note: if you cannot place the wage rate at the level you want, move the two end points individually.) hint: remember to plot each point halfway between the two integers. for example, when the number of workers increases from 0 to 1, the value of the marginal product for the first worker should be plotted with a horizontal coordinate of 0.5, the value halfway between 0 and 1. line segments will automatically connect the points.