Respuesta :
A pre-determined overhead rate is the rate used to apply manufacturing overhead to work-in-process inventory. The pre-determined overhead rate is calculated before the period begins. The first step is to estimate the amount of the activity base that will be required to support operations in the upcoming period. The second step is to estimate the total manufacturing cost at that level of activity. The third step is to compute the predetermined overhead rate by dividing the estimated total manufacturing overhead costs by the estimated total amount of cost driver or activity base. Common activity bases used in the calculation include direct labor costs, direct labor hours, or machine hours.
So
Predetermined oH rate is
(50,000+25,000)÷20,000=3.75
1,500 direct labor hours were used so
The amount of overhead should be applied to this job is
3.75×1,500=5,625
Good luck!
So
Predetermined oH rate is
(50,000+25,000)÷20,000=3.75
1,500 direct labor hours were used so
The amount of overhead should be applied to this job is
3.75×1,500=5,625
Good luck!