Using absorption costing, which of the following manufacturing costs are assigned to products?
Direct materials and direct labor.
1. Direct labor and variable manufacturing overhead.
2. Fixed manufacturing overhead, direct materials, and direct labor.
3. Variable manufacturing overhead, direct materials, and direct labor.
4. Variable manufacturing overhead, direct materials, direct labor, and fixed manufacturing overhead.