Answer:
t = 300.3 seconds
Explanation:
Given that,
The mass of a freight train, [tex]m=1.01\times 10^7\ kg[/tex]
Force applied on the tracks, [tex]F=7.5\times 10^5\ N[/tex]
Initial speed, u = 0
Final speed, v = 80 km/h = 22.3 m/s
We need to find the time taken by it to increase the speed of the train from rest.
The force acting on it is given by :
F = ma
or
[tex]F=\dfrac{m(v-u)}{t}\\\\t=\dfrac{m(v-u)}{F}\\\\t=\dfrac{1.01\times 10^7\times (22.3-0)}{7.5\times 10^5}\\\\t=300.3\ s[/tex]
So, the required time is 300.3 seconds.